Commissioned February 2021
The world’s first large scale plant, sustainably recovering ultra-low-carbon, nanoparticle colloidal silica from geothermal fluid.
Our Assets
Our asset base is growing. We currently have four key assets.
-
Ohaaki Northern Plant, New Zealand
In February 2021, Geo40 commissioned the Ohaaki Northern Plant, the company’s first commercial development, which has the capacity to produce over 5,000 tonnes per annum of ultra-low-carbon colloidal silica.
We make customised products for over a dozen markets.
-
Ohaaki Ngawha Plant, New Zealand
This plant was commissioned in 2018, and is capable of producing 500 tonnes per annum of colloidal silica.
Now being automated to improve profitability, we use this asset to make new innovative silica products.
-
Lithium Test Rig, New Zealand
This plant successfully recovers lithium from geothermal fluid on a continuous basis in New Zealand.
It continues to be modified as out technology develops and is likely to be superseded by a pilot plant in 2022.
-
Silica Pilot Plants, International
We own two container-sized silica recovery plants that have operated in NZ and Japan and are available to partners for small-scale testing and piloting.
Two categories: Two jobs.
Our assets fall into two categories: operational assets and development assets.
Operational assets demonstrate our mineral-recovery technologies at scale and are profitable. Profit, of course, is the engine that permits innovation. Our Northern Plant achieved gross profitability in 2025, proving the technological concept.
Our development assets are smaller and are a key part of the transition from the laboratory to an operational asset. Containerised silica pilot plants paved the way for our operational silica assets.
The same method has been applied to our lithium development. Our pilot plant was successfully deployed across North America throughout 2024, successfully recovering lithium from oilfield wellheads across a wide range of reputable lithium-bearing formations, proving our technology on-site. Our larger-scale lithium demonstration plant has been developed to refine our operations here in New Zealand and will be placed on a to-be-determined global oilfield brine in 2025.